Width: Resize to find out!

Main Site Content

Craft Projects

Most recently, Craft Projects, numbering 10 since 2003. Results are 6 of 10 have worked, creating a 60% project success rate. Pending the results of 1 remaining ongoing project, we may reach 7 of 10 working, which would produce a 70% success rate on Craft initiated projects. Our projects always have an “advantage above normal”, as this is a prerequisite for us to work on them in the first place. This means that they have a better than normal risk (drilling and finding costs) vs potential return (production rate and cumulative production). 

 

Spacer

North Beach Prospect - Fully Funded and Developed

Craft's studies in 2002 showed that, while the area only had 3 marginal producing wells, that this was only a small portion of the oil and gas potential in this area. Craft quietly leased 8,500 acres (188 individual leases) on this project idea generated in house, Initially funded quietly and locally. Craft and co-owners completed 23 productive oil wells, which had an avg. initial production rate  (IPF) of 272 BOPD & 220 MCF. 13 of the 23 had an initial rate of over 300 BOPD with an average IPF of 434 BOPD and 376 MCF with an avg. cum prod of 336,033 BO and 657,433 MCF per well. 

Now, this is all a part of the Little Cedar Creek Smackover Field, which is the largest Jurassic discovery  in the continental US since the mid 1970’s.The Craft wells produced over $400 Million in revenues, with over $330 Million to Craft and co-owners and the remainder to landowners and severance taxes. With an Initial Risk of $4,200,000, we created an 80-1 total reward over initial risk.

Operator, Craft, and Craft Co-Owners drilled 35 wells total: 23 oil productive, 12 dry holes:

Success Rate on wells drilled within project limits: 23/35 = 65.71%.

Spacer

Old Home Prospect - Fully Funded and Developed

Craft's studies in 2008 showed that, while the area had 7 established fields of varying quality (the best of which was Texaco's Appleton Field (approx. 4 Million Barrels of Oil)), that this was only a portion of the fields lying under this area.  In 2010, Craft and his partners began drilling and their first well hit nice Smackover pay on a 185 acre anticline as mapped. The well tested 1,008 Barrels Oil and 874 MCF per day with 1,750 Flowing Tubing Pressure and made 291,278 Barrels of Oil and 367,058 MCF Gas.

Operator, Craft and Craft Co-Owners drilled 19 wells total: 9 oil productive, 10 dry holes:

Success Rate on wells drilled within project limits: 9/19 = 47.36%.

Spacer

River Bend Prospect - Fully Funded and Developed

Craft's studies in 2011 showed that, while the area had 4 established oil fields of varying quality , that this was only a portion of the fields lying under this area.  In 2013, Craft and his partners began drilling and their first well hit nice Smackover pay as mapped. Additional wells found oil and gas in both the Smackover and Norphlet formations.

Operator, Craft and  Craft Co-Owners drilled 22 wells total: 9 oil productive, 13 dry holes:

Success Rate on wells drilled within project limits: 9/22 = 40.90%.

 

Spacer

Bountiful Bend and Battle Branch Oil Development Project - Just Beginning

We currently find the opportunity and good timing to pursue the drilling and potential development of 9 high-graded oil and gas prospective areas in two areas where we are very familiar with and very experienced and have made 12 new oil field discoveries. This project represents ‘extensions’ into the immediately adjacent areas of our previous successes. All 9 prospects have been high-graded with 3-D Seismic coverage. Working with 4,600 acres, we currently work on numerous fronts, including well design, staking and surveying location, well site pad, and access, work with surface owner(s), oil and gas board work, well drilling and completion, and building surface facilities.

With this Project, we currently expand our efforts to continue finding oil for our co-owners and ourselves, and as we work to increase our oil production to meet the future oil price environment. These Projects should reach cumulative peak production around 2024 thru 2028. What will the oil price be then during that upcoming time period is the proper question.

Battle Branch was drilled first and was a dry hole. West Jeddo drilled second and has been successfully completed as a strong producing oil well, testing at rates of 3-400+ Barrels Oil per Day. This is the type of wells we look for in this region, 300+ Barrels Oil per Day with a 300 + MCF Gas per day and with cumulative production ranging from 200-300 Barrels Oil per Acre Foot.

Our company has a track record of 93 productive oil wells out of 139 total wells drilled creating a 67% success rate on all wells drilled from 7/9/06 to 12/18/15.

This project is well into its journey of finding, producing, and selling private U.S. oil.